i101: Cycling infrastructure to meet London Cycling Design Standards

6 supporter
All cycling infrastructure to meet or exceed the London Cycling Design Standards:
https://www.lcc.org.uk/pages/lcds.

Reasons
Hull City Council has repeated demonstrated that it is incapable of designing safe and effective cycling infrastructure.  Much of the existing infrastructure did not meet DoT standards at the time of construction.  The most recent infrastructure, on Beverley Road opposite Fountains Road, is unspeakably awful and obviously seriously dangerous to cyclists and pedestrians.  The dangers were highlighted during consultation, and then ignored.  Cycling infrastructure design needs to meet or exceed best practice for UK conditions, as specified in the London Cycling Design Standards.  Design projects should be outsourced to organisations with a track record of success.  Existing infrastructure needs to be brought up to at least minimum standards.

Suggestions for improvement (0)

written and rated by the supporters of this initiative to improve the proposal and its reasons


Issue #80

check 1. Admission (reached 4) info_outline
check 2. Discussion (finished) info_outline
check 3. Verification (reached 10.0% / 1) info_outline
play_arrow 4. Voting (3 days 22:51:12 left)
During the voting phase, votes for all admitted initiatives in this issue can be cast. The final result will be calculated as soon as this phase ends.

Competing initiatives

This is the only initiative in this issue, because nobody started a competing initiative.

What can I do here?

Login to participate